SF145 (Legislative Session 94 (2025-2026))
Cottonwood public infrastructure replacement bond issue and appropriation
Related bill: HF651
AI Generated Summary
Purpose
This bill proposes a capital investment to improve public infrastructure in the city of Cottonwood. It authorizes funding and bonding to support a phased upgrade of essential services and surrounding infrastructure.
Main Provisions
- Appropriation of 8,000,000 from the bond proceeds fund to the Public Facilities Authority (PFA) to grant to the city of Cottonwood. The grant is for designing, constructing, and equipping Phase 1 of replacing aging public infrastructure.
- The eligible improvements under this Phase 1 include:
- Sanitary sewer system upgrades or replacements
- Drinking water distribution system upgrades or replacements
- Street reconstruction
- Replacement of curb, gutter, and sidewalks
- Improvements needed to connect to the Lincoln Pipestone Rural Water system to improve municipal water quality
- Bonding authorization: The commissioner of management and budget must sell and issue state bonds up to 8,000,000 to fund the appropriation. The bond sale must follow the terms and effects prescribed by Minnesota Statutes sections 16A.631 to 16A.675 and by the Minnesota Constitution article XI sections 4 to 7.
Significant Changes to Existing Law
- Creates a new appropriation and binding authority to fund a city infrastructure project through a grant from the Public Facilities Authority.
- Establishes a new bond issuance up to 8,000,000 specifically to finance this Cottonwood project, guided by existing state bonding statutes and constitutional provisions.
Fiscal and Administrative Details
- Source of funds: bond proceeds fund.
- Implementing entities: Public Facilities Authority (grant recipient) and the commissioner of management and budget (bond sales).
Impact Overview
- Enables physical upgrades to essential utilities (sewer and water), roads, and drainage infrastructure in Cottonwood.
- Aims to improve water quality by connecting to a regional water system.
- Involves state-level financing through bonds and requires adherence to current bond statutes and constitutional rules.
Relevant Terms - Cottonwood - Public infrastructure - Phase 1 - sanitary sewer system - drinking water distribution system - street reconstruction - curb gutter sidewalks - Lincoln Pipestone Rural Water system - municipal water quality - Public Facilities Authority (PFA) - grant - bond proceeds fund - appropriation - bonds - commissioner of management and budget - Minnesota Statutes 16A631 to 16A675 - Minnesota Constitution Article XI sections 4 to 7
Actions
| Date | Chamber | Where | Type | Name | Committee Name |
|---|---|---|---|---|---|
| January 16, 2025 | Senate | Action | Introduction and first reading | ||
| January 16, 2025 | Senate | Action | Referred to | Capital Investment |
Citations
[
{
"analysis": {
"added": [
"References the bond issuance authority under Minn. Stat. §§ 16A631-16A675."
],
"removed": [],
"summary": "This bill section authorizes the sale and issuance of state bonds up to $8,000,000 under Minn. Stat. §§ 16A631-16A675 to finance a grant for the Cottonwood Public Infrastructure project (Phase 1), including sanitary sewer, drinking water distribution, street work, and related connections.",
"modified": []
},
"citation": "Minnesota Statutes sections 16A631 to 16A675",
"subdivision": "Subdivision 2"
}
]Progress through the legislative process
In Committee